# Load-Bearing Wall Removal Dublin | Steel Beam & RSJ Calculations

> Load-bearing wall removal in Dublin designed and signed off by a Chartered Engineer: site visit, steel and padstone calcs, propping, inspection. Fixed fee.

URL: https://structuralengineer.ie/load-bearing-wall-removal/

# Load-Bearing Wall Removal in Dublin

Steel sized to Eurocode from what is actually on the wall, propping specified before anything comes out, and the beam inspected before it is boxed in.

[Call 01 270 9764](tel:+35312709764)

[Get a fixed fee](#quote)

_Image: New steel beam on concrete padstones across a kitchen knock-through in a Dublin semi, props still in place_

- I.S. EN 1990 Basis of design
- I.S. EN 1991-1-1 Actions on structures
- I.S. EN 1993-1-1 Steel design
- I.S. EN 1996-1-1 Masonry design
- TGD A Structure
- TGD B Fire safety
- S275 / S355 structural steel

Last updated: 14 October 2026 · Reviewed by Joachim Louw, CEng MIEI

[StructuralEngineer.ie](https://structuralengineer.ie/) designs and certifies load-bearing wall removal across Dublin, Kildare, Meath and Wicklow. Joachim Louw, a Chartered Engineer (CEng MIEI), visits the house, works out what the wall is carrying, sizes the steel beam and padstones to Eurocode, specifies the propping, and inspects the steel before it is covered. You get calculations your builder and steel fabricator can work from, and a signed certificate your solicitor can hand to a buyer when you sell.

Engineer's fees for a single wall typically run €400–€900 in Ireland, and the whole job, including steel, propping, labour and making good, is usually €2,500–€7,000 depending on the span and what sits above. Your fee is fixed in writing before the visit.

## What happens on the first visit

On the first visit the engineer finds out what the wall is holding up. That means checking which way the floor joists run, what sits on the wall upstairs and in the attic, how thick the wall is, and what the ends of the new beam will bear onto. For a single wall it usually takes under an hour.

- Lift a floorboard or look into the attic to see which way the joists and any roof struts run
- Check upstairs for a wall, chimney breast or water tank landing on the wall you want removed
- Measure the opening you want, the wall thickness and the masonry at each bearing end
- Note gas pipes, water and cables running through the wall so the builder can plan reroutes
- Look at the floor and, if a heavy point load will land on it, decide whether a trial hole is needed to see the foundation
- Talk through the opening you want and what span is practical before the design starts

## How to tell what a wall is carrying

Thickness is not a reliable test. A 100 mm blockwork wall can be carrying a floor, and a 225 mm wall can be carrying almost nothing. What matters is what bears on it.

In a typical two-storey Dublin semi, the first-floor joists span from the front and back external walls onto a spine wall in the middle of the house, usually the wall between the front and back reception rooms. That spine wall is almost always load-bearing, and it is the one most people want to remove for an open-plan kitchen.

Roofs matter too. Older cut roofs often have struts and purlin props landing on internal walls upstairs, and that load comes down through the wall you are looking at. Trussed-rafter roofs, used widely from the 1970s on, span between the external walls, so upstairs partitions in those houses often carry no roof load. That has to be checked in the attic, not assumed.

## Steel beam, padstones and bearings

Most domestic knock-throughs use a universal beam (UB) in S275 or S355 steel, sized to I.S. EN 1993-1-1 for strength and for deflection. Deflection matters as much as strength: a beam that is strong enough but too flexible will crack the ceiling and the wall above. Imposed-load deflection is commonly limited to span/360 for plastered finishes.

The beam sits on padstones, which are precast concrete or engineering-brick blocks that spread the concentrated load from the beam ends into the masonry below. The masonry is checked for bearing to I.S. EN 1996-1-1. Where the wall below is weak or the load is high, the calcs may call for a longer padstone, a steel post, or a new pad foundation.

Fire protection is part of the design. Technical Guidance Document B requires structural elements in a typical two-storey house to have at least 30 minutes' fire resistance, so the calcs specify how the steel is to be encased or coated.

## Propping and temporary works

Before any blockwork comes out, the floor and wall above have to be held up. That is usually done with adjustable steel props and needles, which are short beams passed through holes cut in the wall above the opening, plus props under the ceiling joists on both sides.

The engineer specifies how many props, where they go, and what they stand on. A prop standing on a suspended timber floor or a thin screed can punch straight through. The props stay in until the beam is installed, the padstones are bedded, and the gap above the beam is packed tight with dry-pack mortar.

## Planning, Building Regulations, party walls and selling later

Removing an internal wall usually does not need planning permission, because works that only affect the interior of a house are exempted development. The exception is a protected structure, where internal works need permission. The Building Regulations still apply in full: Part A (Structure) and Part B (Fire) govern the new opening whether or not planning is needed.

If the beam will bear into a wall you share with a neighbour, the Land and Conveyancing Law Reform Act 2009 (sections 44–45) sets out your rights and obligations: notify the neighbour, make good any damage, and cover their reasonable professional fees.

When you sell, the buyer's solicitor will ask for an engineer's opinion of compliance for the opening. That is straightforward to give when the engineer inspected the steel before it was boxed in, and much harder once it is plastered over. Opening up the finishes later costs more than the inspection would have.

Builder already has the loads and only needs the beam sized? See [RSJ calculations](https://structuralengineer.ie/rsj-calculations/). For the full cost picture, read the [cost to remove a load-bearing wall in Dublin](https://structuralengineer.ie/guide/load-bearing-wall-removal-cost/).

## What's included

- Site visit by a Chartered Engineer
- Load take-down from roof to foundation
- Steel beam and padstone calculations to Eurocode
- Marked-up drawing with beam size, bearings and padstones
- Propping and temporary-works sequence
- Steel schedule your fabricator can price from
- Inspection of the installed steel before it is covered
- Signed opinion of compliance with Building Regulations Part A

Typical market range: **€400–€900** (engineer's fee, one wall; whole job €2,500–€7,000+). Source: Cork Demolitions; BuildTech cost guides, 2026. Fixed fee confirmed in writing before the visit.

## Builder's guess, online calcs or an engineer on site

Three ways the steel for a knock-through gets sized, and what each leaves you with when you sell.

| Check | Builder sizes it by eye | Online calcs, no visit | Chartered Engineer on site |
| --- | --- | --- | --- |
| Someone checks what is above the wall | No | no (relies on your photos) | Yes |
| Steel sized to Eurocode with written calcs | No | Yes | Yes |
| Padstones checked against the actual masonry | No | assumed | Yes |
| Propping specified before demolition | builder's judgement | sometimes | Yes |
| Steel inspected before it is boxed in | No | No | Yes |
| Certificate a buyer's solicitor will accept | No | limited (no inspection) | Yes |
| Can act as BCAR assigned certifier on a larger project | No | No | Yes (CEng) |

Sources

- [Cork Demolitions: cost to remove a load-bearing wall (Ireland)](https://corkdemolitions.ie/cost-to-remove-load-bearing-wall/)
- [BuildTech: residential structural engineer cost Ireland](https://buildtech.ie/blog/residential-structural-engineer-cost-ireland)
- [Land and Conveyancing Law Reform Act 2009, s.44](https://revisedacts.lawreform.ie/eli/2009/act/27/section/44/revised/en/html)
- [Department of Housing: Technical Guidance Documents](https://www.gov.ie/en/collection/26ce3-building-regulations-technical-guidance-documents/)

Talk to the engineer

01 270 9764

Mon–Fri 8:00–18:00. Callback the same working day.

[Call now](tel:+35312709764)

Fixed fee confirmed in writing before the visit.

Standards we design to

- I.S. EN 1990 Basis of design
- I.S. EN 1991-1-1 Actions on structures
- I.S. EN 1993-1-1 Steel design
- I.S. EN 1996-1-1 Masonry design
- TGD A Structure
- TGD B Fire safety
- S275 / S355 structural steel

Before you book: costs and rules

- [Cost to Remove a Load-Bearing Wall in Dublin (2026)](https://structuralengineer.ie/guide/load-bearing-wall-removal-cost/)
- [Do I Need a Structural Engineer to Remove a Wall?](https://structuralengineer.ie/guide/do-i-need-a-structural-engineer-to-remove-a-wall/)
- [Party Wall Works in Ireland: Putting a Steel Beam into a Shared Wall](https://structuralengineer.ie/guide/party-wall-steel-beam-ireland/)
- [RSJ vs Lintel vs Steel Beam: What's the Difference?](https://structuralengineer.ie/guide/rsj-vs-steel-beam-vs-lintel/)
- [Opinion of Compliance vs Certificate of Compliance: The Difference](https://structuralengineer.ie/guide/opinion-of-compliance-vs-certificate-of-compliance/)

How the job runs

## How a wall removal is designed and signed off

- 01

### Call and fixed quote

Tell us about the wall and the opening you want. You get a fixed fee in writing before anyone visits.
- 02

### Site visit

The engineer checks joists, roof, upstairs walls and bearings, and agrees the opening with you.
- 03

### Calcs and drawing

Beam, padstones, propping sequence and fire protection, issued to you and your builder.
- 04

### Inspection and certificate

The steel is inspected once it is installed and before it is covered, then the signed opinion of compliance is issued.

What the work involves

## Typical stages on site

Illustrative images of typical work, not photographs of specific client projects.

_Image: Props and needles installed before a load-bearing wall is cut out in a Dublin kitchen_

Props and needles installed before a load-bearing wall is cut out in a Dublin kitchen

_Image: Builders lifting a steel beam onto padstones during a knock-through_

Builders lifting a steel beam onto padstones during a knock-through

_Image: Steel beam end bearing on a concrete padstone with dry-pack mortar packed above_

Steel beam end bearing on a concrete padstone with dry-pack mortar packed above

_Image: Finished open-plan kitchen with the boxed-in beam where the wall used to be_

Finished open-plan kitchen with the boxed-in beam where the wall used to be

### Typical before and after

_Image: Before: separate kitchen and dining room divided by a load-bearing wall in a 1970s Dublin semi_

Before Illustrative

_Image: After: the same view with the wall removed and a boxed-in beam over one open-plan kitchen and dining room_

After Illustrative

Removing a wall? Get the steel, padstones and propping designed first.

Fixed fee confirmed in writing before the visit.

[Call 01 270 9764](tel:+35312709764)

[Request a fixed fee](#quote)

Questions

## Load-bearing wall removal: common questions

**How do I know if my wall is load bearing?**

Check what sits on it. If floor joists upstairs run at right angles to the wall and land on it, or a wall, chimney breast or roof strut sits directly above it, it is load-bearing. In most two-storey Dublin semis the wall between the front and back rooms carries the first floor. An engineer confirms it on site by lifting a floorboard and checking the attic.

**Can my builder put in a steel without an engineer?**

Physically yes, but there are no calculations behind it, no record of the bearing and padstone check, and nobody independent inspects it. When you sell, the buyer's solicitor will ask for an engineer's opinion of compliance, and an engineer cannot certify steel they never designed or saw. Retrospective certification usually means opening up ceilings and walls.

**Do I need planning permission to remove a load-bearing wall?**

Usually not. Works affecting only the interior of a house are exempted development under the Planning and Development Act 2000. The exceptions are protected structures and some apartments with management-company rules. Building Regulations Part A (Structure) and Part B (Fire) still apply to the new opening in every case.

**How long does it take to remove a load-bearing wall?**

The engineering normally takes one site visit and a few working days for the calcs. On site, a single opening typically takes two to five days: propping, cutting out, installing the beam and padstones, packing, and the engineer's inspection. Plastering and fire protection follow, and drying time depends on the finish.

**What areas do you cover?**

Dublin and the Greater Dublin Area (Kildare, Meath and Wicklow). Site visits are booked from the Blackrock office. Site visit usually within 5 working days.

## Related services

[### RSJ Calculations

Beam and padstone calcs and a steel schedule for builders who already know what they need.](https://structuralengineer.ie/rsj-calculations/)

[### Openings for Sliding Doors

Widening a rear wall for sliding or bifold doors: goalpost frames and lintels.](https://structuralengineer.ie/rear-wall-opening-for-sliding-doors/)

[### Chimney Breast Removal

Gallows brackets or a beam when the breast comes out downstairs but the stack stays.](https://structuralengineer.ie/chimney-breast-removal/)

Next step

Get a fixed fee for your wall removal

Call [01 270 9764](tel:+35312709764), or send the details and we'll call you back.

Request a fixed engineering fee

Prefer to talk? [Call 01 270 9764](tel:+35312709764). A live person answers during office hours.
