What Happens on a Structural Engineer Visit?

What the engineer looks at, how long it takes, what to have ready, and what arrives afterwards.

By StructuralEngineer.ie · Reviewed by Joachim Louw, CEng MIEI · Updated

StructuralEngineer.ie's short answer: on a structural engineer visit, the engineer works out what the structure is carrying and what the ground and walls can take. That means looking in the attic, lifting a floorboard if needed, measuring openings, and checking for cracks, trees and drains. For a single wall it usually takes under an hour. Calcs, drawings or a report follow within days.

What the engineer checks

It depends on the job, but most visits cover:

  • Load paths. Which way the floor joists run, what sits on the wall, and what the roof bears on
  • The attic. Roof type (trussed or cut), struts, purlins and water tanks
  • Walls and bearings. Construction (block, brick or timber frame) and condition where new steel will sit
  • Cracking. Width, pattern and location, if that’s the concern
  • Outside. Trees, drains, manholes, boundaries and ground levels for extensions
  • Paperwork. Drawings, planning history and any previous certificates

How long it takes

Job Typical visit
Single wall removal Under an hour
Extension design About an hour, longer with trial holes
Attic conversion About an hour
Crack or subsidence investigation One to two hours
Pre-purchase structural survey One to three hours, depending on the house

What to have ready

  • Access to every room, the attic hatch and the back garden
  • Any drawings, from the architect, the planning application or the builder
  • What you want to do, with sizes if you have them, such as the opening width or the extension footprint
  • Dates: when cracks appeared, when previous works were done
  • Your timeline, such as a builder start date or a closing date

What you get afterwards

  • Design jobs. Calculations, drawings or marked-up sketches, and a steel schedule
  • Investigations. A written report with findings, cause, seriousness and recommendations
  • Surveys. A report with photos and next steps before you sign
  • Then inspections during the work and a signed certificate at the end, where that’s part of the job

Timings at StructuralEngineer.ie: Site visit usually within 5 working days. Written report or calcs within 5 working days of the visit.

Bottom line

The visit is short and practical. The engineer needs to see what bears on what. Have access, drawings and dates ready, and you’ll get a clear answer quickly. To book a visit with a fixed fee, call 01 270 9764.

Want a fixed fee for your job? Call 01 270 9764.

Callback the same working day. Fixed fee confirmed in writing before the visit.

Frequently asked questions

Do I need to be home for the visit?

Yes, or someone who can give access to every room, the attic and the garden. The engineer may also need to lift a floorboard or look behind a panel, so let them know if anything is fragile.

Will the engineer give me an answer on the day?

Often a verbal view on the day, such as 'yes, it's load-bearing' or 'that crack looks like shrinkage'. The calcs, drawings or written report follow.

Can the visit be done by video?

For a simple RSJ calc where the loads are clear, photos and measurements can be enough. For cracking, extensions, attics and anything uncertain, the engineer needs to see it.

Get a fixed engineering fee

Two short steps. We call back the same working day.

Prefer to talk? Call 01 270 9764. A live person answers during office hours.

Step 1 of 2: the job
Step 2 of 2: how to reach you

Call 01 270 9764 · Same-day callback